Plans, Epics & DAG

OSTwin organizes work in a three-level hierarchy: Plans contain Epics which are ordered by a DAG (Directed Acyclic Graph). But the real story is how a plan β€” a human-authored vision of what to build β€” gets decomposed into units of work that autonomous agents can execute with high quality, without human micromanagement.

The key insight: DoD (Definition of Done) and AC (Acceptance Criteria) are the twin pillars that let every agent β€” regardless of role β€” understand what β€œdone” looks like and how to verify it. Tasks are deliberately kept minimal. The agent fills in the how.

The Decomposition Story

Human Intent Agent Execution
───────────── ───────────────
"What should we build?" "How do I build it right?"
Plan (the big picture) β†’ Epic (a scoped unit of work)
└── Written by humans └── Assigned to a war-room
└── Declares the WHY └── DoD: WHAT must be true
└── Establishes constraints └── AC: HOW to verify it's true
└── Tasks: agent decides the HOW

A plan starts as a single document β€” PLAN.md β€” capturing what the human wants built. The manager agent then decomposes this plan into epics, each with a clear scope. But here’s the critical design choice: we deliberately define only the most basic tasks. We don’t prescribe detailed step-by-step instructions.

Why? Because over-specifying tasks biases the agent toward a particular implementation path. By keeping tasks minimal, we force each agent to harness its own practice β€” its skills, its experience, its judgment β€” to determine the best approach. The guardrails aren’t in the tasks. The guardrails are in DoD and AC.

DoD and AC: Two Pillars, One Quality Contract

Every epic carries two complementary specifications that together form its quality contract:

Definition of Done (DoD) β€” The WHAT

The DoD is a checklist of concrete, verifiable outcomes. It answers the question: β€œWhat must be true when this epic is complete?”

### Definition of Done
- [ ] Login endpoint returns valid JWT with 1-hour expiry
- [ ] Invalid credentials return 401 with descriptive error
- [ ] Rate limiting: max 5 attempts per minute per IP
- [ ] All endpoints have OpenAPI documentation
- [ ] Test coverage >= 95% on auth module

The DoD is outcome-oriented. It doesn’t say how to implement rate limiting β€” only that it must exist and behave a certain way. This gives the engineer agent the freedom to choose the right approach while keeping the goalposts clear.

Acceptance Criteria (AC) β€” The HOW to Verify

AC provides behavioral specifications that answer: β€œHow do we prove the DoD is satisfied?”

### Acceptance Criteria
Given a user with valid credentials
When they POST to /auth/login with email and password
Then they receive a 200 response with a JWT token
And the token contains user_id and role claims
And the token expires in 3600 seconds

AC is verification-oriented. It gives the QA agent a precise script to test against. Where DoD says β€œlogin works,” AC says β€œhere’s exactly what β€˜login works’ looks like when I test it.”

Why Both Pillars Are Essential

DoD and AC support each other. Neither is sufficient alone:

Without DoDWithout AC
The engineer doesn’t know what to buildThe engineer knows what but can’t tell if they built it correctly
The QA agent has no outcomes to verifyThe QA agent has outcomes but no test plan to verify them
Tasks drift toward tangential work”Done” becomes subjective β€” β€œit works on my machine”

Together, they create a closed loop:

DoD defines the target ─────► Engineer implements toward the target
β”‚
β–Ό
AC defines the test ─────► QA verifies against the test
β”‚
β–Ό
If DoD βœ“ and AC βœ“ β†’ epic passes
If DoD βœ— or AC βœ— β†’ epic fails, retry

This is why you can run an epic without explicit tasks β€” the agent can derive tasks from DoD+AC. But you should never run an epic without both DoD and AC. They are the minimum viable contract for quality.

Plan Hierarchy

With this philosophy in mind, here’s the full hierarchy:

Plan (PLAN.md)
β”œβ”€β”€ Epic 1: Setup database schema
β”‚ └── DoD: [outcomes] AC: [behavioral specs]
β”œβ”€β”€ Epic 2: Implement auth API (depends on Epic 1)
β”‚ └── DoD: [outcomes] AC: [behavioral specs]
β”œβ”€β”€ Epic 3: Build admin dashboard (depends on Epic 2)
β”‚ └── DoD: [outcomes] AC: [behavioral specs]
└── Epic 4: Write documentation (depends on Epics 2 & 3)
└── DoD: [outcomes] AC: [behavioral specs]

Each epic is a self-contained unit. Its DoD and AC travel with it into the war-room, becoming the contract that every agent in that room works against.

Plan Definition Format

Plans are defined in a markdown file (PLAN.md) with structured epic blocks:

# Authentication System
Build a complete authentication system with database-backed
sessions, REST API, admin dashboard, and documentation.
## EPIC-001: Database Schema
Setup the PostgreSQL schema for users and sessions.
- depends_on: []
- roles: [engineer, qa]
### Definition of Done
- [ ] Users table with email, password_hash, created_at
- [ ] Sessions table with token, user_id, expires_at
- [ ] Migration scripts tested on clean database
### Acceptance Criteria
Given a clean PostgreSQL database
When the migration scripts are executed
Then the users table exists with columns: email, password_hash, created_at
And the sessions table exists with columns: token, user_id, expires_at
And running migrations on an already-migrated database produces no errors
## EPIC-002: Auth API
Implement REST endpoints for authentication flows.
- depends_on: [EPIC-001]
- roles: [engineer, qa, architect]
### Definition of Done
- [ ] POST /auth/login returns JWT
- [ ] POST /auth/refresh extends session
- [ ] POST /auth/reset sends password reset email
- [ ] 95% test coverage on auth module
### Acceptance Criteria
Given a registered user with email "test@example.com" and password "secret"
When they POST to /auth/login with those credentials
Then they receive a 200 response with a JWT token
And the token contains user_id and role claims
And the token expires in 3600 seconds
## EPIC-003: Admin Dashboard
Build the admin interface for user and session management.
- depends_on: [EPIC-002]
- roles: [engineer, qa]
## EPIC-004: Documentation
Write API reference and admin guide.
- depends_on: [EPIC-002, EPIC-003]
- roles: [engineer]

Tasks: Deliberately Minimal

Epics may include a task breakdown, but tasks are intentionally basic:

### Tasks
- TASK-001: Implement auth endpoints
- TASK-002: Write tests

That’s it. Not β€œTASK-001: Create Express router at src/routes/auth.ts, add JWT middleware using jsonwebtoken package, implement bcrypt comparison…” β€” that level of detail biases the agent and defeats the purpose of having autonomous agents in the first place.

The principle: Tasks provide sequencing hints, not implementation instructions. The agent uses its skills and judgment to determine the how. DoD and AC are what keep it on track.

You can even omit tasks entirely. The manager or engineer agent will derive them from the DoD and AC:

DoD: "Login endpoint returns valid JWT"
AC: "POST /auth/login β†’ 200 + JWT token"
β”‚
β–Ό (agent derives)
TASK-001: Implement login endpoint
TASK-002: Validate against AC scenarios

Per-Plan Files

Each plan generates several files during processing:

FilePurpose
PLAN.mdSource plan with epic definitions
PLAN.meta.jsonComputed metadata (timestamps, status, epic count)
PLAN.roles.jsonRole assignments per epic
PLAN.refined.mdManager-refined plan with expanded details
DAG.jsonComputed dependency graph
PLAN.skills.jsonSkill assignments per epic

These files live in .agents/plans/{plan-id}/.

Epic Metadata Directives

Epics support inline metadata directives that control execution:

DirectiveTypeDescription
depends_onstring[]Epic refs that must complete first
rolesstring[]Roles to assign to the war-room
priorityintExecution priority within a wave (lower = first)
timeoutintMax seconds before auto-escalation
max_retriesintHow many times QA can fail before escalation
modelstringModel override for this epic’s agents
no_mcpboolWhether to disable MCP for this epic
skill_refsstring[]Additional skills for this epic

DAG Building: Kahn’s Algorithm

OSTwin converts epic dependencies into a DAG using Kahn’s algorithm for topological sorting:

  1. Parse all depends_on references from epics
  2. Build an adjacency list and compute in-degrees
  3. Initialize a queue with all epics that have zero dependencies (in-degree = 0)
  4. Process the queue: for each epic, reduce in-degrees of its dependents
  5. Epics reaching in-degree 0 join the current wave
  6. Repeat until all epics are scheduled or a cycle is detected

DAG.json Structure

The computed DAG is stored as a JSON file:

{
"plan_id": "plan-001",
"generated_at": "2025-01-15T09:00:00Z",
"nodes": {
"EPIC-001": {
"title": "Database Schema",
"depends_on": [],
"wave": 0,
"priority": 1,
"roles": ["engineer", "qa"]
},
"EPIC-002": {
"title": "Auth API",
"depends_on": ["EPIC-001"],
"wave": 1,
"priority": 1,
"roles": ["engineer", "qa", "architect"]
},
"EPIC-003": {
"title": "Admin Dashboard",
"depends_on": ["EPIC-002"],
"wave": 2,
"priority": 1,
"roles": ["engineer", "qa"]
},
"EPIC-004": {
"title": "Documentation",
"depends_on": ["EPIC-002", "EPIC-003"],
"wave": 3,
"priority": 1,
"roles": ["engineer"]
}
},
"waves": [
["EPIC-001"],
["EPIC-002"],
["EPIC-003"],
["EPIC-004"]
],
"critical_path": ["EPIC-001", "EPIC-002", "EPIC-003", "EPIC-004"]
}

Key DAG Concepts

PLAN-REVIEW Root

Every DAG includes a synthetic PLAN-REVIEW node at wave 0. This node represents the plan review step where the manager validates the plan before execution begins. All user-defined epics depend on PLAN-REVIEW implicitly.

Dependency Gating

An epic cannot begin execution until all of its dependencies have reached the passed terminal state. If any dependency fails, the dependent epic is blocked and the manager is notified.

Wave Parallelism

Epics in the same wave have no dependencies on each other and can execute in parallel. The system creates one war-room per epic and runs all rooms in a wave concurrently (up to the 50-room limit).

Wave 0: [PLAN-REVIEW]
Wave 1: [EPIC-001] ← Sequential start
Wave 2: [EPIC-002, EPIC-005, EPIC-006] ← 3 rooms in parallel
Wave 3: [EPIC-003, EPIC-004] ← 2 rooms in parallel
Wave 4: [EPIC-007] ← Final integration

Critical Path

The longest path through the DAG determines the minimum execution time. The manager uses the critical path to prioritize epics and allocate resources.

Two-Stage DAG

OSTwin uses a two-stage DAG process:

Planning DAG

Created during the plan-review phase. Uses rough estimates and may contain placeholder dependencies. The manager refines this DAG based on plan review feedback.

Solid DAG

Created after plan review is complete and all epics are fully specified. This is the executable DAG that drives war-room creation and wave scheduling.

PLAN.md β†’ Planning DAG β†’ Manager Review β†’ PLAN.refined.md β†’ Solid DAG β†’ Execution

How DoD and AC Flow Through the System

The quality contract doesn’t stay in PLAN.md β€” it propagates through every stage:

PLAN.md
β”‚
β”œβ”€β”€ DoD + AC written per epic
β”‚
β–Ό
config.json (war-room)
β”‚ DefinitionOfDone: [...]
β”‚ AcceptanceCriteria: [...]
β”‚
β”œβ”€β”€ Engineer reads DoD β†’ derives tasks, implements
β”œβ”€β”€ QA reads AC β†’ writes test scenarios, verifies
β”œβ”€β”€ QA reads DoD β†’ checks outcomes checkbox by checkbox
β”‚
β–Ό
Channel messages
β”‚ engineer β†’ qa: "done" (claims DoD is satisfied)
β”‚ qa β†’ engineer: "pass" (verified both DoD and AC)
β”‚ qa β†’ engineer: "fail" (AC scenario X failed)
β”‚
β–Ό
Terminal state: "passed" only when DoD βœ“ AND AC βœ“

Every role in the war-room uses DoD and AC differently, but they all use the same source of truth. This is what makes multi-agent collaboration work without a human in the loop β€” the quality contract is unambiguous and shared.

Key Source Files

FilePurpose
.agents/Build-PlanningDAG.ps1Kahn’s algorithm implementation
.agents/plan/Start-Plan.ps1Wave resolution from DAG state
.agents/plans/*/PLAN.mdPlan definitions
.agents/plans/*/DAG.jsonComputed dependency graphs
.agents/plan/Start-Plan.ps1 (Plan Review logic)Plan review orchestration